# Pilot Survey: How to Test Your Questionnaire Before the Main Study

How to run a pilot survey before the main study: purpose, size, a seven-point review, cognitive interviews and a decision table for fix, drop or go.

Published 2026-10-16 · Updated 2026-11-16
Canonical: https://hercules.works/blogs/pilot-survey-india

A pilot survey is a small run of the real questionnaire, with the real audience, to find problems before the main study. Check the screener, incidence, wording, routing, length and the open answers. Fix what you find, then launch. A pilot of 100 responses costs ₹15,000 on our Plus plan, and the first 30 responses are free. A pilot is not a results sample: do not add its data to the main study if you changed the questions.

## A Pilot Finds the Mistakes Before They Cost You Money

A questionnaire that looks fine to its author often fails with real respondents: a screener that lets everyone through, an option that is missing, a question people read differently. A pilot finds these while they are cheap to fix.

This guide covers what a pilot is, its size, a seven-point review and what to do with the result. The costs use our list prices.

## What a Pilot Is and How Big It Should Be

A pilot is the real survey run on a small number of the real audience. It has two jobs: find problems, and estimate incidence and length. There is no standard size. Choose one large enough to see the problems and incidence you need. For a share near 50%, 100 responses give about ±9.8 points in a simple random sample, enough for a rough read and not for decisions.

| Step | Plan | Responses | Price per response | Cost |
|---|---|---|---|---|
| Test the questionnaire | Free | 30 | ₹0 | ₹0 |
| Pilot | Plus | 100 | ₹150 | ₹15,000 |

## Seven Checks

| Check | Look for |
|---|---|
| Screener | Does the right share pass? Is anyone passing who should not? |
| Incidence | How many people did you screen to find one qualifier? |
| Wording | Which questions got "don't know" or odd answers? |
| Options | How many used "other", and what did they write? |
| Routing | Did anyone see a question that did not apply to them? |
| Length | Where did people drop out, and how long did it take on a phone? |
| Open answers | Do they show the question was understood? |

Read the open answers yourself. They are the quickest way to see misunderstanding.

## Add a Few Interviews

For new or tricky questions, ask a handful of people to read each question aloud and say what it means to them. This is a cognitive interview. It finds wording problems that numbers do not show. See [moderated interviews](/blogs/moderated-web-call-interviews-india).

## Fix, Drop or Go

| Finding | Action |
|---|---|
| A question is misread | Reword and pilot again |
| An option is missing | Add it, with other |
| The screener passes too few | Relax it or change the audience |
| Drop-out is high at one point | Shorten or move the question |
| All is clear | Launch; keep pilot data separate unless the questions are unchanged |

## Worked Example: Incidence and Screening Cost

Incidence is the share of people screened who qualify. A pilot gives you your first real figure. Say you screen 300 people for "bought a packaged snack in the last week" and 45 qualify. Incidence is 45 ÷ 300 = 15%.

Now plan the main study. If you need 400 qualified answers at 15% incidence, you must screen about 400 ÷ 0.15 = 2,667 people. At 30% incidence you would screen 1,333. Illustrative figures, but the arithmetic shows why a low-incidence audience changes the plan.

On our platform, screened-out respondents do not count towards a response bundle. Even so, ask for a feasibility count for your city and age band before you commit, because the number of members who can qualify varies by city.

A small pilot gives a wide range for incidence. With 300 screened and 15% qualifying, the margin is 1.96 × √(0.15 × 0.85 ÷ 300) = about ±4.0 points in a simple random sample. So the true figure could be 11% to 19%. Plan with the low end if cost matters.

## Reading Drop-Off and Length

Count how many people reach each question. A sharp fall at one question points to that question. A slow fall across the whole survey points to length.

| Question reached | Respondents (illustrative) | Fall from the previous |
|---|---|---|
| Q1 | 100 | 0 |
| Q8 | 94 | 6 |
| Q9 (a grid of 10 rows) | 71 | 23 |
| Q10 | 69 | 2 |

The fall of 23 at Q9 is the finding. Do not shorten the whole survey. Break the grid into two shorter questions, or cut rows, then pilot again. Time the survey on a phone yourself. Ask one or two pilot respondents how long it felt.

## What a Pilot Cannot Test

A pilot of 100 will not exercise rare routing paths. If a branch applies to 2% of people, the chance that none of 100 respondents sees it is 0.98 to the power 100, which is about 13%. For a branch that applies to 5%, it is 0.95 to the power 100, about 0.6%.

So test every path yourself. Walk through the survey once for each route: screen-out, each skip, each "other, please specify". Do this in the preview, as a respondent would. A pilot checks how people behave. Your own walk-through checks that the logic works.

A pilot also cannot give a reliable estimate of the final result. Treat any percentage from 100 answers as a rough read.

## Cognitive Interview Script

Use the same few probes for every question you test. Keep the interview short and do not defend your wording.

| Probe | What it reveals |
|---|---|
| "In your own words, what is this question asking?" | Whether the meaning matches your intent |
| "How did you come up with that answer?" | Whether the person recalled, guessed or took a shortcut |
| "Was any word hard or unclear?" | Jargon and translation problems |
| "Is there an answer you wanted to give that was not listed?" | Missing options |
| "How sure are you of that answer?" | Questions that ask for details people cannot recall |

Run these in the respondent's own language, and avoid colleagues who know the brand. They already know what you mean.

## Common Pilot Mistakes

| Mistake | Why it misleads |
|---|---|
| Piloting on colleagues or friends | They know the brand and the aim, so they do not trip on unclear wording |
| Piloting in one language only | A translated scale may read differently, and you will not see it |
| Changing questions during the pilot without a log | You cannot tell which version produced which answer |
| Judging only by completion | People can finish and still misread a question |
| Running a pilot with a wider audience than the main study | Incidence and drop-off will not match the real run |

Keep a one-page log: date, version, what you found, what you changed. It makes the decision to launch easy to defend.

## Pilot Scorecard Template

Copy this and fill it after each pilot round.

| Item | Result | Decision |
|---|---|---|
| Responses collected | ___ | |
| Screened / qualified / incidence | ___ / ___ / ___% | |
| Questions with many "don't know" or odd answers | ___ | Reword |
| Options written under "other" more than a few times | ___ | Add option |
| Question with the largest drop-off | ___ | Fix or cut |
| Paths walked through by us | ___ of ___ | |
| Languages checked by a native speaker | ___ | |
| Open answers that show a misreading | ___ | Reword |
| Ready to launch? | Yes / No | |

## Running This Study on Hercules

If your job is to pilot a consumer questionnaire in India, this is the free test and the 100-response pilot at list price, then the main study.

Pricing is per response, and the free plan covers a 30-response pilot: see [pricing](/pricing). How respondents are verified and sampled: [panel methodology](/panel-methodology).

The limit: the app reaches smartphone users only, so offline households need face-to-face fieldwork.

## Frequently asked questions

### What is a pilot survey?

A small run of the real questionnaire with the real audience to find problems in wording, screening, routing and length before the main study.

### How many people should be in a pilot?

There is no standard. Enough to see the problems and estimate incidence. We use 30 free responses to test the questionnaire and 100 for a pilot at list price.

### Can I use pilot data in the final results?

Only if the questions did not change. If you changed any, keep the pilot separate.

### What is a cognitive interview?

A short interview in which a person reads a question aloud and says what it means to them. It exposes wording problems.

### Is a pilot the same as a soft launch?

They are similar. A soft launch runs the first part of the main fieldwork and then pauses to check, while a pilot is a separate small run.

### How long should a pilot run?

Long enough to collect your target number of responses across the groups you plan to survey. If a quota cell fills slowly in the pilot, that cell will be slow in the main study too.

### What is the difference between a pilot and a pretest?

The words are often used together. A pretest usually means testing the questions, for example by cognitive interview. A pilot runs the whole survey, including screening and routing, on a small sample of the real audience.

### What should I do if my pilot has very low incidence?

Check the screener wording first, then check whether the audience is too narrow. Relax a criterion, widen the cities or age bands, or plan for a larger screening count.
